Solid bulk cargo terminals
 
Príncipe Felipe Dock
E004 / E005 / E006 / E007

 
  • Multi-purpose dock with 4 mooring facilities for LNG, solid and liquid bulk cargo.
  • 807 m. mooring line with a maximum 13.72 m. depth.
  • Total surface area  of 116,261 m2
  • 1 100t mobile crane, 2 of 80t, and another one of 63t.
  • Cranes of 12, 16 and 30t.
  • Reception facilities, unloading of bulk cement via a pipe with storage facilities: Two 14,600t cement silos as well as to two warehouses of 10,000t and 20,000t.
  • Certification ISO 9001 for Solid Bulk Cargo Traffic.
  • Total surface area: 109,125 m2.
  • 58,282 m2 of open storage areas.
  • 13,905 m2 closed storage areas.
  • Connected to the RENFE railway network.
  • Official services and users building.
  • Weighing bridge for 60t trucks.
  • 38,220 m2 of warehouses for solid fertilisers.
  • Storage tanks for liquid fertilisers with a total surface area of 7,000 m2.
  • Facilities for the unloading of bulk liquids via pipeline.
 
Isaac Peral Dock
E007 / E008 / E009
  • 480 m. long for mooring and with a depth of 13.72 m.
  • Total surface area: 164,006 m2.
  • Certification ISO 9001 for Solid Bulk Cargo Traffic.
  • Connected to the railway network.
  • Cranes of 12, 16 and 30t.
  • 1 100t mobile crane, 2 of 80t, and another one of 63t.
  • 19,220 m2 closed storage areas.
  • Weighing bridge for trucks and railway
  • Dock that is 150m long with a depth of 5m for auxiliary vessels.

 

Multi-purpose dock
E021 / E022
  • 576 m. mooring line.
  • Maximum depth of 21 m.
  • Storage area of 231,605 m2 
  • Two mobile cranes of 100t and 140t.
  • Railway connection.

 

Southern Dock
E023 / E024
  • 601 m. mooring line.
  • Maximum depth of 21 m.
  • Storage area of 17,776 m2
  • 10,000 m2 closed storage areas.
  • Two mobile cranes of 100t and 140t.
  • Railway connection.
  • Liquid bilk cargo terminals

LNG carriers mooring
E001

  • Pontoon that is 445 m. long with a depth of 12.50 m.
  • LNG unloading facilities for vessels up to 310 m long.

 

Dock for Fertilisers
E002
  • Dock that is 330 m. long with a depth of 7.00 m.
  • Multi-purpose dock for liquid and solid bulk cargo.

 

Príncipe Felipe Northern Dock
E003
  • Dock that is 277 m. long with a depth of 11.25 m.
  • Multi-purpose dock for liquid bulk cargo (ammonia, phosphoric compounds and LNG)
  • Capacity of 20,000 DWT.

 

Southeast Pier
E010 / E 011
  • 2 moorings of 130 m. long with a depth of 13.20 m. for liquid bulk cargo
  • 2 diesel intakes and one for fuel oil.
  • 4 unloading arms with a 6" diameter, 2  for phenol and 2 for acetone.
  • Operations with acetone, phenol and hydrocarbons.
  • Terminal for loading of vegetable oils.
 
Pier
E012
  • Dock that is  200 m. long with a depth of 8.00 m.
  • LPG unloading terminal
  • Operations with acetone, phenol and hydrocarbons.
  • Terminal for loading of vegetable oils.

 

Pontoon
E013 / E014
  • 2 mooring that are 325 m. long with  depths of 13.20 and 10.50 m.
  • Operates with bulk liquid cargo, refined and LPG.
  • 12 diesel intakes and 4 for fuel oil.

 

Maese Dock
E015 / E016
  • Dock that is 362 m. long with a depth of 9.90 m.
  • Prepared to operate with all kinds of oil refining products, vegetable oils and bioethanol.
  • Biodiesel loading terminal
  • 12 diesel intakes.
  • Dock Inspection Office
 
Bastarreche Dock
E017 / E018
  • E017: Dock for oil refining products that is 400 m. long with a depth of 10.80 m.
  • E018:: Dock that is 417 m long with a depth of 21.40 m with special facility so that 250,000 DWT super tankers can dock to unload crude oil with five swivel arms that can handle 3,500 T/h each.
  • 16 diesel intakes and 16 for fuel oil.
  • LPG unloading terminal
 
Bastarreche Pontoon
E20
  • 450m pontoon with a depth of 24 m for crude oil
  • Capacity for 315,000 DWT.
 
 
 
Other moorings.
Southwest Dock
E025 / E026
  • Sea wall that is 1,000m long
  • Dock with 822 m. of mooring lines with a depth of up to 26 m.
  • Intended to moor ships on standby.