Escombreras Inner Harbour
No hay resultados
breadcrumb_contenido
Escombreras Inner Harbour
Solid bulk cargo terminals
Príncipe Felipe Dock
E004 / E005 / E006 / E007
Príncipe Felipe Dock
E004 / E005 / E006 / E007
- Multi-purpose dock with 4 mooring facilities for LNG, solid and liquid bulk cargo.
- 807 m. mooring line with a maximum 13.72 m. depth.
- Total surface area of 116,261 m2
- 1 100t mobile crane, 2 of 80t, and another one of 63t.
- Cranes of 12, 16 and 30t.
- Reception facilities, unloading of bulk cement via a pipe with storage facilities: Two 14,600t cement silos as well as to two warehouses of 10,000t and 20,000t.
- Certification ISO 9001 for Solid Bulk Cargo Traffic.
- Total surface area: 109,125 m2.
- 58,282 m2 of open storage areas.
- 13,905 m2 closed storage areas.
- Connected to the RENFE railway network.
- Official services and users building.
- Weighing bridge for 60t trucks.
- 38,220 m2 of warehouses for solid fertilisers.
- Storage tanks for liquid fertilisers with a total surface area of 7,000 m2.
- Facilities for the unloading of bulk liquids via pipeline.
Isaac Peral Dock
E007 / E008 / E009
- 480 m. long for mooring and with a depth of 13.72 m.
- Total surface area: 164,006 m2.
- Certification ISO 9001 for Solid Bulk Cargo Traffic.
- Connected to the railway network.
- Cranes of 12, 16 and 30t.
- 1 100t mobile crane, 2 of 80t, and another one of 63t.
- 19,220 m2 closed storage areas.
- Weighing bridge for trucks and railway
- Dock that is 150m long with a depth of 5m for auxiliary vessels.
Multi-purpose dock
E021 / E022
E021 / E022
- 576 m. mooring line.
- Maximum depth of 21 m.
- Storage area of 231,605 m2
- Two mobile cranes of 100t and 140t.
- Railway connection.
Southern Dock
E023 / E024
E023 / E024
- 601 m. mooring line.
- Maximum depth of 21 m.
- Storage area of 17,776 m2
- 10,000 m2 closed storage areas.
- Two mobile cranes of 100t and 140t.
- Railway connection.
- Liquid bilk cargo terminals
LNG carriers mooring
E001
- Pontoon that is 445 m. long with a depth of 12.50 m.
- LNG unloading facilities for vessels up to 310 m long.
Dock for Fertilisers
E002
E002
- Dock that is 330 m. long with a depth of 7.00 m.
- Multi-purpose dock for liquid and solid bulk cargo.
Príncipe Felipe Northern Dock
E003
E003
- Dock that is 277 m. long with a depth of 11.25 m.
- Multi-purpose dock for liquid bulk cargo (ammonia, phosphoric compounds and LNG)
- Capacity of 20,000 DWT.
Southeast Pier
E010 / E 011
E010 / E 011
- 2 moorings of 130 m. long with a depth of 13.20 m. for liquid bulk cargo
- 2 diesel intakes and one for fuel oil.
- 4 unloading arms with a 6" diameter, 2 for phenol and 2 for acetone.
- Operations with acetone, phenol and hydrocarbons.
- Terminal for loading of vegetable oils.
Pier
E012
- Dock that is 200 m. long with a depth of 8.00 m.
- LPG unloading terminal
- Operations with acetone, phenol and hydrocarbons.
- Terminal for loading of vegetable oils.
Pontoon
E013 / E014
E013 / E014
- 2 mooring that are 325 m. long with depths of 13.20 and 10.50 m.
- Operates with bulk liquid cargo, refined and LPG.
- 12 diesel intakes and 4 for fuel oil.
Maese Dock
E015 / E016
E015 / E016
- Dock that is 362 m. long with a depth of 9.90 m.
- Prepared to operate with all kinds of oil refining products, vegetable oils and bioethanol.
- Biodiesel loading terminal
- 12 diesel intakes.
- Dock Inspection Office
Bastarreche Dock
E017 / E018
- E017: Dock for oil refining products that is 400 m. long with a depth of 10.80 m.
- E018:: Dock that is 417 m long with a depth of 21.40 m with special facility so that 250,000 DWT super tankers can dock to unload crude oil with five swivel arms that can handle 3,500 T/h each.
- 16 diesel intakes and 16 for fuel oil.
- LPG unloading terminal
Bastarreche Pontoon
E20
- 450m pontoon with a depth of 24 m for crude oil
- Capacity for 315,000 DWT.
Other moorings.
Southwest Dock
E025 / E026
- Sea wall that is 1,000m long
- Dock with 822 m. of mooring lines with a depth of up to 26 m.
- Intended to moor ships on standby.